We provided M&E design services up to GRIP Stage 5 for the refurbishment of this former Eurostar facility, originally built in the 1990s. Works included upgrades to heating and air conditioning systems within the office areas, as well as the installation of bespoke controlled emission toilets to support new rail maintenance operations.
We delivered M&E design to GRIP Stage 5 for a new train fuelling and servicing facility at Barrow depot, supporting up to three carriages simultaneously. The scope included overhead lighting, boosted water supplies, and infrastructure for specialist rail equipment, along with completion of all required Network Rail forms.
Copyright © Sutcliffe Consulting Engineers Ltd. All rights reserved.
Registered in England and Wales: Co. Reg No: 4139535