We provided the full M&E building services design for the Costello Community Facility, delivering an energy-efficient and future-ready solution. The design included electric heating, VRF air conditioning, heat recovery ventilation, domestic water services, drainage, LED lighting, power distribution, fire alarms, emergency lighting, CCTV, access control and data infrastructure, creating a safe, comfortable and sustainable facility for occupants.

We provided detailed M&E design to convert a shell & core unit into a vibrant on-campus pizzeria. Working with PSV Design, the fit-out included commercial kitchen facilities, servery, hot drinks station, and social seating areas. We also reviewed O&M documentation and completed handover snagging to meet University standards.

We delivered RIBA Stage 4 M&E design for one of the UK’s largest Air Source Heat Pump installations, replacing gas-fired boilers across three council buildings. Funded by a £13.75m Public Sector Decarbonisation Scheme grant, the project includes a 3MW system at Hillingdon Civic Centre. The systems use non-toxic refrigerants with zero ozone depletion and low global warming potential, supporting Hillingdon’s carbon reduction goals.
Copyright © Sutcliffe Consulting Engineers Ltd. All rights reserved.
Registered in England and Wales: Co. Reg No: 4139535